Chief Engineer Maurice Gannaway with project manager and surveyors
|
|
|
|
Northeast tower (#6) gone, two other eastern towers (#4, #5) still standing
|
|
|
|
East center tower (#5) falling
|
|
|
|
East center tower (#5) continues falling
|
|
|
|
East center tower (#5) closeup
|
|
|
|
East center tower (#5) wide shot
|
|
|
|
Southeast tower (#4) starts falling
|
|
|
|
|
Southeast tower (#4) breaks, continues to fall
|
|
|
|
Southwest tower (#1) begins to fall
|
|
|
|
Southwest tower (#1) bends and strikes ground
|
|
|
|
Northwest tower (#3) starts to fall
|
|
|
|
Northwest tower (#3) folds over
|
|
|
|
The crew cuts a guy wire to bring down a tower
|
|
|
|
Demolition of "dog house" at east center tower (#5)
|
|
|
|
|
Maurice Gannaway with crew
|
|
|
|
Nothing left!
|
|
|
|
What's left of a top beacon after collapse
|
|
|
|
Tower crew
|
|
|
|
Unloading tower sections
|
|
|
|
Unloading tower sections
|
|
|
|
Checking progress at east center tower (#5)
|
|
|
|
|
Problem with concrete base at east center tower (#5)
|
|
|
|
Painting tower sections
|
|
|
|
Connecting wires
|
|
|
|
East center tower (#5) partially stacked
|
|
|
|
Hoisting a tower section on east center tower (#5)
|
|
|
|
Pouring the base for northwest tower (#3)
|
|
|
|
Hoisting electrical conduit on southeast tower (#4)
|
|
|
|
|
Southeast tower (#4)
|
|
|
|
Riding down
|
|
|
|
Partially stacked tower
|
|
|
|
Paul Strout welding on the ground
|
|
|
|
Paul Strout welding in the air
|
|
|
|
Checking the guy wires
|
|
|
|
Base of southeast tower (#4) showing the Austin ring transformer which powers the tower lights
|
|
|
|
|
Unloading tractor for tower base and guy anchor excavation
|
|
|