|
|
|
Empty lot before building delivery (2004)
|
|
|
|
Grading the entrance (2004)
|
|
|
|
The building arrives (2004)
|
|
|
|
"So close, and yet so far" (2004)
|
|
|
|
Unloading the building (2004)
|
|
|
|
Setting the building in place (2004)
|
|
|
|
Front view of building (2004)
|
|
|
|
|
Rear view of building (2004)
|
|
|
|
Interior view (2004)
|
|
|
|
Tower bases (2004)
|
|
|
|
Tower sections (2004)
|
|
|
|
Cables behind building (2004)
|
|
|
|
Extra sample line in cable pit behind building (2004)
|
|
|
|
Burried cables (2004)
|
|
|
|
|
Cables at tower 2 (2004)
|
|
|
|
Cable pit (2004)
|
|
|
|
Cable pit (2004)
|
|
|
|
Tower base (2004)
|
|
|
|
Interior with transmitter, equipment rack and phasing cabinet (2004)
|
|
|
|
Rear view of transmitter, rack and phasing cabinet (2004)
|
|
|
|
Burying the cables (2004)
|
|
|
|
|
Fillling the pit with sand (2004)
|
|
|
|
Cable pit with sand (2004)
|
|
|
|
Transmission and sample lines behind building (2004)
|
|
|